Magna Carta Park Generator
Magna Carta Park Generator Open Door
Magna Carta Park Inside Generator
Magna Carta Park Generator Doors Open

Project Details

Company: Midgard Limited
Products Included: AP20S, electric kiosk, BMS system, 40A manual changeover, specially requested RAL colour
Location: United Kingdom
Application: Located outside to provide backup power for water pumps
Project Completion Period: 4 weeks
Date: October 2020

Project Overview

Here at CPS, we don’t just build standard sets, we can make sets completely bespoke to your requirements. Due to our R&D Team, in house fabrication team and our UK Factory, one of our most recent projects is proof of this!

One of our UK based M&E Contractor won a project for an AP20S set to be based outside for prime power for a water pump system, they were worried about the standard white canopy being an eyesore for visitors and passers-by so requested that we produce a bespoke set colour, being olive green to match the beautiful surroundings and countryside. Along with this amendment, they also requested fittings to connect to their BMS system to notify them upon certain cues. Due to the requirements of the power for the water pumps, the client requested the assistance of a well-established design consultant to design the specially made electrical Kiosk. Our electrical team worked very closely with the design consultant to ensure all upgrades where signed off including lighting beacons and stop start signals.

The generator itself will be delivered and installed by the appointed electrical contractor on a very famous site. The site is where in the Magna Carta was first drafted by Archbishop of Canterbury Stephen Langton and agreed to and signed by King John of England over 100 years ago.