Challenge

We have an order and we have a date that the order needs to be in by. The order is for two 1000kva open set gensets with a Perkins 4008-TAG2A engine and a UK Stamford HCI634J alternator. With it being an international order, lead times are always asked. The main reason being that it can take anything from 20 days to 40 days to travel the world on a boat.

Unfortunately, we cannot drag the boat to make it quicker, so to win projects for our international dealers we promise to meet their required lead times. For these two 1000kva open sets we have 7 days to build them in, that is including testing of both units and loading it on the ship.

Solution

The engines, as you can see from the images look superb, you can tell it’s real British engineering with these rather large 4000 series engines. The 8 cylinder engines were delivered to us on Friday evening along with the radiators and Stamford Alternators.

The production team cannot wait to start building these sets and our Production Manager, Matthew Jackson, is currently prepping his team and looking forward to the challenge ahead.

Results

Another Milestone for Team CPS and another international project won by Constant Power Solutions!

PRINT PAGE