Challenge

The challenge was to be able to take on 33 Gensets in the space of a few weeks and deliver impeccable results to our customer Power Engineers Bangladesh Ltd. who helped us to secure this order which really put into perspective for us how much we have grown, and the true capabilities of the hard-working team behind us.

Solution

On a rainy and rather a dreary Monday morning all our spirits were lifted by the sight and pride of 33 Perkins generators being loaded into two 40 foot containers ready to be shipped off to Asia. The order consisted of 30 AP11.5S-1PH models coupled with Stamford alternators, 2 AP250S with Mecc Alte alternators and ATS switches to provide a seamless transition to back up power supply. Also included was an AP200S set which was coupled up with a Stamford alternator. As always these generators were complete with Deep Sea Electronic control modules and built into high quality, weather and soundproof canopies.

Results

We have no doubt about the positive impact that these power solutions will have and we are always delighted when our UK products get to be appreciated and distributed worldwide.

PRINT PAGE